Waterproof Long Lead | Black Hardware
Waterproof Long Lead | Black Hardware
Backwoods Dog 5/8" Waterproof BioThane Dog Long Lead | Black Hardware
Long leads or recall leads are the perfect tool to aid in your dog's training. BioThane waterproof vegan leather webbing makes this the most durable and mess—proof line you can buy! No matter the terrain or weather conditions this long lead will allow your dog to run further from your side and still have a safe link to you—and the best part? It's 100% waterproof, stink-proof and washable!
Handmade from authentic Beta 520 Standard BioThane, our leashes have the look and feel of leather without the maintenance. Stink-proof, waterproof, washable, and soft to the touch. Highly durable and maintains flexibility even in extremely cold weather. It will outlast other leash materials, available in a rainbow of bright and earthy colours, and it's vegan!
Rugged dog gear for every adventure. Built tough to last. Proudly made in the “backwoods” of Ontario, Canada.
Features:
- 5/8-Inch Wide Beta 520 Standard BioThane® Webbing
- 5/8-Inch Trigger Hook: Silver or Dark Chrome
- 5/8-Inch Welded D-ring
- 100% Waterproof
- 100% Stinkproof
- 100% Vegan
*Pictured in: Royal Blue. If you need help finding the right colour, please contact us at: backwoodsdogstore@gmail.com
Sizing
Sizing
Collars:
To ensure an accurate fit, please snuggly measure the circumference of your dog's neck where you want the collar to sit. Ideally, the size should be close to the middle measurement of our collars, if your dog is within one inch of the collar size, size down or up accordingly. All our sizes are measured in inches (").
Harnesses:
To ensure an accurate fit, please snuggly measure the circumference of your dog's neck and chest. Our harnesses are ideal for medium to large size dogs. Our harness sizes are based on chest size.
Still unsure about the size?
Please contact us at: backwoodsdogstore@gmail.com and we can help you get it right!
Care Instructions
Care Instructions
BioThane is extremely easy to care for. Simply wipe away dirt with a cloth or wash with soap and water. To disinfect, dab with a small amount of rubbing alcohol. Keep away from extreme heat or fire. Do not use bug repellent on product. Avoid harsh cleaners and chemicals as this can cause breakdown of the material and hardware.
BioThane is a polyester webbing with a PVC coating that makes it more durable, waterproof, easy to clean, and is made in the U.S.A.