Skip to product information
1 of 2

Backwoods Dog

Waterproof BioThane Long Lead | Brass Hardware

Waterproof BioThane Long Lead | Brass Hardware

Waterproof • Stinkproof • Handmade in Canada 

Regular price $69.99 CAD
Regular price Sale price $69.99 CAD
Sale Sold out
Shipping calculated at checkout.

Size
Quantity

Backwoods Dog 5/8" Waterproof BioThane Dog Long Lead | Brass Hardware


Live the Adventure. More Freedom, Classic Brass Style.

Give your dog room to roam while keeping a safe connection. Our 5/8" Waterproof BioThane Dog Long Lead with Brass Hardware is a practical training tool for recall work, distance commands, trail walks, open fields, camping, cottage weekends, and supervised exploring.

Made with Genuine Beta 520 Standard BioThane, this long lead has the look and feel of leather without the maintenance. It is waterproof, stink-proof, washable, vegan, and easy to clean after dragging through grass, mud, sand, snow, or wet terrain.

The slimmer 5/8" width keeps this long lead lighter and easier to manage, making it a great choice for smaller dogs, puppies, training sessions, or anyone who prefers less bulk in a longer line. Finished with solid brass hardware, it offers a warm, timeless look that pairs beautifully with earthy, bold, and neutral BioThane colours. Brass is naturally corrosion-resistant and develops a rich golden patina over time, adding character with every adventure.

Perfect for building recall, practicing safe distance, giving your dog more freedom to sniff, or exploring open spaces together while staying connected.

No stink. No soaking. No fuss. Just practical, adventure-ready freedom for your dog’s next big outing.

Proudly handcrafted in the backwoods of Ontario, Canada.

  • Features:
    5/8-Inch Beta 520 Standard BioThane Webbing – Lightweight, flexible & easy to handle
  • Long Lead Design – Great for recall training, distance work, open spaces & supervised exploring
  • Solid Brass Trigger Snap Hook – Strong, classic & naturally corrosion-resistant
  • Solid Brass Welded D-Ring – Durable attachment point with a warm, timeless finish
  • 100% Waterproof, Stinkproof & Weatherproof – Adventure-ready & easy to clean
  • Mess-Proof Training Line – Rinses clean after mud, grass, sand, snow, or wet terrain
  • Cold-Weather Ready – Maintains flexibility even in extremely cold weather
  • Handcrafted for the Rugged Outdoors – Built for training, trails, camping, cottage life & dogs who need room to roam
  • 100% Vegan – No leather, no fuss, no maintenance
View full details
  • 5 stars: 6 (100%)
  • 4 stars: 0 (0%)
  • 3 stars: 0 (0%)
  • 2 stars: 0 (0%)
  • 1 star: 0 (0%)
R
Raven Ivany
30 foot Long Line

Absolutely love the 30 foot long line! It kept clean and stink free while being dragged through the woods! Will be a great training tool for my puppy’s recall :)

J
Joseph Majkut
Great Product, Received as Ordered

The leashes were custom made to perfection. Shipping was prompt and we enjoy using our new leashes every day. Thank you for creating a great Canadian product.

J
Janice Carere
Leather leash

Great leash, sturdy, doesn't tangle.

R
Roddy Marnoch
martingale collar

Love these collars. They’re soooo stylish! The brass hardware is unique & beautiful. Love this Canadian company. Thank you Backwoods dog

G
Gregory Denardis
Long line 15 foot

Live this leash and the fact it stays flexible even at -33

C
Catherine
Just Perfect

I kept looking for the right harness and leashes for my large Sheltie. Harness leash and collar are perfect for our beach and rain walks. The customizable products are comfortable, hard working, and really attractive. The bonus is they are made in Ontario! Very happy and highly recommended.